<?xml version="1.0" encoding="UTF-8"?><rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>UPS Shutdown Guide: NUT and Automatic Server Shutdown</title><description>Plain guides to Network UPS Tools and automatic server shutdown on UPS hardware, built from published official documentation.</description><link>https://upsshutdownguide.com/</link><language>en</language><atom:link href="https://upsshutdownguide.com/rss.xml" rel="self" type="application/rss+xml"/><item><title>Fix NUT Data Stale and USB Disconnect Errors</title><link>https://upsshutdownguide.com/posts/fix-nut-data-stale-usb-disconnect-errors/</link><guid isPermaLink="true">https://upsshutdownguide.com/posts/fix-nut-data-stale-usb-disconnect-errors/</guid><description>Diagnose NUT Data stale and USB disconnect errors, then verify UPS status on Debian, Proxmox VE, or TrueNAS after checking logs and settings.</description><pubDate>Fri, 27 Nov 2026 00:00:00 GMT</pubDate><content:encoded>&lt;p&gt;When Network UPS Tools (NUT) reports &lt;code&gt;Data stale&lt;/code&gt;, its server has stopped receiving fresh updates from the UPS driver. Check whether the USB device disappears first. If it does, try another USB data cable or port. If the device stays visible, check the driver logs and restart the managed driver after correcting any configuration or permissions problem. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/FAQ.html&quot;&gt;NUT FAQ&lt;/a&gt;&lt;/p&gt;
&lt;h2&gt;Check whether USB or the driver failed&lt;/h2&gt;
&lt;p&gt;Run these queries on the machine serving UPS data. &lt;code&gt;upsc -l&lt;/code&gt; lists the UPS names configured on the local NUT server. Replace &lt;code&gt;myups&lt;/code&gt; with the name it returns. &lt;a href=&quot;https://manpages.debian.org/trixie/nut-client/upsc.8.en.html&quot;&gt;Debian upsc manual&lt;/a&gt;&lt;/p&gt;
&lt;pre&gt;&lt;code class=&quot;language-sh&quot;&gt;upsc -l
upsc myups@localhost ups.status
&lt;/code&gt;&lt;/pre&gt;
&lt;p&gt;On Linux, run &lt;code&gt;lsusb&lt;/code&gt; to see whether the UPS is present. From an administrator shell, check &lt;code&gt;journalctl -k&lt;/code&gt; for a disconnect around the time of the error. A device that briefly drops out may be back in &lt;code&gt;lsusb&lt;/code&gt; by the time you check. &lt;a href=&quot;https://manpages.debian.org/trixie/usbutils/lsusb.8.en.html&quot;&gt;Debian lsusb manual&lt;/a&gt; &lt;a href=&quot;https://manpages.debian.org/trixie/systemd/journalctl.1.en.html&quot;&gt;Debian journalctl manual&lt;/a&gt; &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/FAQ.html&quot;&gt;NUT FAQ&lt;/a&gt;&lt;/p&gt;
&lt;pre&gt;&lt;code class=&quot;language-sh&quot;&gt;lsusb
journalctl -k
&lt;/code&gt;&lt;/pre&gt;
&lt;table&gt;
&lt;thead&gt;
&lt;tr&gt;
&lt;th&gt;What you find&lt;/th&gt;
&lt;th&gt;What to do&lt;/th&gt;
&lt;/tr&gt;
&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;
&lt;td&gt;The UPS disappears from &lt;code&gt;lsusb&lt;/code&gt;, or the kernel logs &lt;code&gt;USB disconnect&lt;/code&gt; for its port.&lt;/td&gt;
&lt;td&gt;Reseat the USB data connection and try a different USB data cable or computer port. Check the USB listing and kernel log again. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/FAQ.html&quot;&gt;NUT FAQ&lt;/a&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;The UPS is visible, but the driver logs &lt;code&gt;Operation not permitted&lt;/code&gt; when claiming it.&lt;/td&gt;
&lt;td&gt;If you just installed NUT with the USB cable already connected, unplug and reconnect the data cable so Linux can apply NUT&apos;s udev rules. Then restart the managed driver. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/FAQ.html&quot;&gt;NUT FAQ&lt;/a&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;The kernel logs &lt;code&gt;did not claim interface 0 before use&lt;/code&gt;.&lt;/td&gt;
&lt;td&gt;Check for competing driver copies. If a manual &lt;code&gt;upsdrvctl start&lt;/code&gt; was used alongside a systemd-managed driver, leave a single managed instance for this UPS. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/FAQ.html&quot;&gt;NUT FAQ&lt;/a&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;&lt;code&gt;upsc&lt;/code&gt; reports &lt;code&gt;Driver not connected&lt;/code&gt;.&lt;/td&gt;
&lt;td&gt;&lt;code&gt;upsd&lt;/code&gt; cannot connect to the driver. Check the UPS entry and the driver service logs for why the driver failed to start or connect. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/FAQ.html&quot;&gt;NUT FAQ&lt;/a&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;h2&gt;Check and restart the Debian driver&lt;/h2&gt;
&lt;p&gt;On Debian 13 with the packaged &lt;code&gt;nut-server&lt;/code&gt;, run &lt;code&gt;upsdrvsvcctl list myups&lt;/code&gt; to find the unit for the UPS&apos;s section in &lt;code&gt;/etc/nut/ups.conf&lt;/code&gt;. Replace &lt;code&gt;myups&lt;/code&gt; with your section name. In the log command, replace &lt;code&gt;nut-driver@myups.service&lt;/code&gt; with the mapped unit. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT configuration guide&lt;/a&gt; &lt;a href=&quot;https://manpages.debian.org/trixie/nut-server/upsdrvsvcctl.8.en.html&quot;&gt;Debian upsdrvsvcctl manual&lt;/a&gt; &lt;a href=&quot;https://manpages.debian.org/trixie/systemd/journalctl.1.en.html&quot;&gt;Debian journalctl manual&lt;/a&gt;&lt;/p&gt;
&lt;pre&gt;&lt;code class=&quot;language-sh&quot;&gt;upsdrvsvcctl list myups
journalctl -u nut-driver@myups.service
&lt;/code&gt;&lt;/pre&gt;
&lt;p&gt;Check the UPS model against NUT&apos;s hardware list before changing the driver. For a supported &lt;code&gt;usbhid-ups&lt;/code&gt; device, use &lt;code&gt;port = auto&lt;/code&gt;. If USB stays visible but the logs repeatedly show errors such as &lt;code&gt;control timeout on ep0in&lt;/code&gt;, the driver manual suggests trying &lt;code&gt;pollinterval = 10&lt;/code&gt;. Set it in the existing UPS section of &lt;code&gt;/etc/nut/ups.conf&lt;/code&gt; and retain the other settings for your device. &lt;a href=&quot;https://networkupstools.org/stable-hcl.html&quot;&gt;NUT hardware compatibility list&lt;/a&gt; &lt;a href=&quot;https://manpages.debian.org/trixie/nut-server/usbhid-ups.8.en.html&quot;&gt;Debian usbhid-ups manual&lt;/a&gt; &lt;a href=&quot;https://manpages.debian.org/trixie/nut-server/ups.conf.5.en.html&quot;&gt;Debian ups.conf manual&lt;/a&gt; &lt;a href=&quot;https://github.com/networkupstools/nut/blob/v2.8.1/drivers/main.c&quot;&gt;NUT driver configuration source&lt;/a&gt; &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT configuration guide&lt;/a&gt;&lt;/p&gt;
&lt;pre&gt;&lt;code class=&quot;language-ini&quot;&gt;[myups]
    driver = usbhid-ups
    port = auto
    pollinterval = 10
&lt;/code&gt;&lt;/pre&gt;
&lt;p&gt;Restart the affected driver when the UPS is on line power. If a UPS was last seen on battery and communication stays down, &lt;code&gt;upsmon&lt;/code&gt; assumes its battery is low once it declares the UPS dead. This can trigger a shutdown. Run the stop and start commands from an administrator shell. &lt;a href=&quot;https://manpages.debian.org/trixie/nut-client/upsmon.conf.5.en.html&quot;&gt;Debian upsmon.conf manual&lt;/a&gt; &lt;a href=&quot;https://manpages.debian.org/trixie/nut-server/upsdrvsvcctl.8.en.html&quot;&gt;Debian upsdrvsvcctl manual&lt;/a&gt;&lt;/p&gt;
&lt;pre&gt;&lt;code class=&quot;language-sh&quot;&gt;upsdrvsvcctl stop myups
upsdrvsvcctl start myups
&lt;/code&gt;&lt;/pre&gt;
&lt;h2&gt;Check USB passthrough on Proxmox VE&lt;/h2&gt;
&lt;p&gt;If NUT runs on a Proxmox VE 9.0 host using the Debian NUT package, use the Debian steps on the host. For NUT in a Linux VM, compare &lt;code&gt;lsusb&lt;/code&gt; on the host and in the guest. If the UPS appears on the host only, check the VM&apos;s USB assignment. &lt;a href=&quot;https://newsletter.proxmox.com/archive/280d75a8-e59a-4c3c-b32f-4a9ce6f14ac6&quot;&gt;Proxmox VE 9.0 release&lt;/a&gt; &lt;a href=&quot;https://github.com/proxmox/pve-docs/blob/master/qm.adoc&quot;&gt;Proxmox USB passthrough documentation&lt;/a&gt; &lt;a href=&quot;https://manpages.debian.org/trixie/usbutils/lsusb.8.en.html&quot;&gt;Debian lsusb manual&lt;/a&gt;&lt;/p&gt;
&lt;p&gt;In the VM&apos;s &lt;strong&gt;Hardware&lt;/strong&gt; tab, open the existing &lt;strong&gt;USB Device&lt;/strong&gt; entry or select &lt;strong&gt;Add &amp;gt; USB Device&lt;/strong&gt; if it is missing. Select &lt;strong&gt;Use USB Vendor/Device ID&lt;/strong&gt; and match the UPS&apos;s ID pair from the host&apos;s &lt;code&gt;lsusb&lt;/code&gt; listing. If several devices share that pair, select &lt;strong&gt;Use USB Port&lt;/strong&gt; and choose the physical port. Recheck any port-based assignment after moving the cable, then run &lt;code&gt;lsusb&lt;/code&gt; again in the guest. &lt;a href=&quot;https://github.com/proxmox/pve-manager/blob/master/www/manager6/qemu/Config.js&quot;&gt;Proxmox VM settings&lt;/a&gt; &lt;a href=&quot;https://github.com/proxmox/pve-manager/blob/master/www/manager6/qemu/HardwareView.js&quot;&gt;Proxmox Hardware interface&lt;/a&gt; &lt;a href=&quot;https://github.com/proxmox/pve-manager/blob/master/www/manager6/qemu/USBEdit.js&quot;&gt;Proxmox USB Device editor&lt;/a&gt; &lt;a href=&quot;https://github.com/proxmox/pve-docs/blob/master/qm.adoc&quot;&gt;Proxmox USB passthrough documentation&lt;/a&gt; &lt;a href=&quot;https://manpages.debian.org/trixie/usbutils/lsusb.8.en.html&quot;&gt;Debian lsusb manual&lt;/a&gt;&lt;/p&gt;
&lt;h2&gt;Check the UPS service on TrueNAS&lt;/h2&gt;
&lt;p&gt;On TrueNAS 25.10, open &lt;strong&gt;System &amp;gt; Services&lt;/strong&gt; and locate &lt;strong&gt;UPS&lt;/strong&gt;. If the service is running, wait until the UPS is on line power, then stop the service from the &lt;strong&gt;Status&lt;/strong&gt; column. Click the edit icon. For a directly attached USB UPS, check that &lt;strong&gt;UPS Mode&lt;/strong&gt; is &lt;strong&gt;Master&lt;/strong&gt;, &lt;strong&gt;Driver&lt;/strong&gt; matches the model, and &lt;strong&gt;Port or Hostname&lt;/strong&gt; is &lt;code&gt;auto&lt;/code&gt; for USB detection. &lt;a href=&quot;https://www.truenas.com/docs/scale/25.10/scaletutorials/systemsettings/services/upsservicesscale/&quot;&gt;TrueNAS UPS guide&lt;/a&gt; &lt;a href=&quot;https://www.truenas.com/docs/scale/25.10/scaleuireference/systemsettings/services/&quot;&gt;TrueNAS Services screen&lt;/a&gt; &lt;a href=&quot;https://www.truenas.com/docs/scale/25.10/scaleuireference/systemsettings/services/upsservicesscreenscale/&quot;&gt;TrueNAS UPS screen&lt;/a&gt; &lt;a href=&quot;https://github.com/truenas/middleware/blob/TS-25.10.0/src/middlewared/middlewared/plugins/ups.py&quot;&gt;TrueNAS UPS middleware&lt;/a&gt; &lt;a href=&quot;https://manpages.debian.org/trixie/nut-client/upsmon.conf.5.en.html&quot;&gt;Debian upsmon.conf manual&lt;/a&gt;&lt;/p&gt;
&lt;p&gt;If the UPS is attached to another machine and TrueNAS uses &lt;strong&gt;Slave&lt;/strong&gt; mode, check USB and driver logs on that machine. In TrueNAS, verify &lt;strong&gt;Identifier&lt;/strong&gt;, &lt;strong&gt;Remote Host&lt;/strong&gt;, and &lt;strong&gt;Remote Port&lt;/strong&gt; against the NUT server&apos;s settings. &lt;a href=&quot;https://www.truenas.com/docs/scale/25.10/scaleuireference/systemsettings/services/upsservicesscreenscale/&quot;&gt;TrueNAS UPS screen&lt;/a&gt; &lt;a href=&quot;https://github.com/truenas/middleware/blob/TS-25.10.0/src/middlewared/middlewared/plugins/ups.py&quot;&gt;TrueNAS UPS middleware&lt;/a&gt; &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/FAQ.html&quot;&gt;NUT FAQ&lt;/a&gt;&lt;/p&gt;
&lt;p&gt;For a directly attached UPS that repeatedly logs &lt;code&gt;libusb_get_interrupt: Unknown error&lt;/code&gt;, the TrueNAS guide documents &lt;code&gt;pollinterval = 10&lt;/code&gt; in &lt;strong&gt;Auxiliary Parameters (ups.conf)&lt;/strong&gt;. TrueNAS marks auxiliary parameters unsupported and leaves them unvalidated. Incorrect settings can cause data corruption or loss. &lt;a href=&quot;https://www.truenas.com/docs/scale/25.10/scaletutorials/systemsettings/services/upsservicesscale/&quot;&gt;TrueNAS UPS guide&lt;/a&gt; &lt;a href=&quot;https://www.truenas.com/docs/scale/25.10/scaleuireference/systemsettings/services/upsservicesscreenscale/&quot;&gt;TrueNAS UPS screen&lt;/a&gt;&lt;/p&gt;
&lt;p&gt;Apply any changes and start &lt;strong&gt;UPS&lt;/strong&gt; again from the &lt;strong&gt;Status&lt;/strong&gt; column. &lt;a href=&quot;https://www.truenas.com/docs/scale/25.10/scaleuireference/systemsettings/services/&quot;&gt;TrueNAS Services screen&lt;/a&gt;&lt;/p&gt;
&lt;h2&gt;Confirm UPS status is back&lt;/h2&gt;
&lt;p&gt;Repeat the status query after the restart and again later if the error was intermittent. For a UPS directly attached to TrueNAS, run the query in a Linux shell under &lt;strong&gt;System &amp;gt; Shell&lt;/strong&gt;. Substitute the UPS &lt;strong&gt;Identifier&lt;/strong&gt; for &lt;code&gt;myups&lt;/code&gt;. A status containing &lt;code&gt;OL&lt;/code&gt; indicates that the UPS reports line power. &lt;a href=&quot;https://manpages.debian.org/trixie/nut-client/upsc.8.en.html&quot;&gt;Debian upsc manual&lt;/a&gt; &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT configuration guide&lt;/a&gt; &lt;a href=&quot;https://www.truenas.com/docs/scale/25.10/scaleuireference/systemsettings/shellscale/&quot;&gt;TrueNAS Shell screen&lt;/a&gt; &lt;a href=&quot;https://github.com/truenas/middleware/blob/TS-25.10.0/src/middlewared/middlewared/plugins/ups.py&quot;&gt;TrueNAS UPS middleware&lt;/a&gt; &lt;a href=&quot;https://www.truenas.com/docs/scale/25.10/scaleuireference/systemsettings/services/upsservicesscreenscale/&quot;&gt;TrueNAS UPS screen&lt;/a&gt;&lt;/p&gt;
&lt;pre&gt;&lt;code class=&quot;language-sh&quot;&gt;upsc myups@localhost ups.status
&lt;/code&gt;&lt;/pre&gt;
&lt;p&gt;If the error returns, compare the latest USB and driver logs to see which failed first. A status that matches the UPS&apos;s current power state confirms that NUT is serving status data. The NUT manual covers shutdown testing separately. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/FAQ.html&quot;&gt;NUT FAQ&lt;/a&gt; &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT configuration guide&lt;/a&gt;&lt;/p&gt;
&lt;p&gt;&lt;em&gt;Evidence and limits. Checked on November 27, 2026. NUT 2.8.5 and Debian 13&apos;s NUT 2.8.1 documentation were used, along with the Proxmox VE 9.0 release notes, Proxmox documentation and interface source, and TrueNAS 25.10 documentation and source. The steps were not run for this article.&lt;/em&gt;&lt;/p&gt;
</content:encoded><category>nut</category><category>ups</category><category>usb</category><category>debian</category><category>proxmox</category><category>truenas</category><author>UPS Shutdown Guide Editorial</author></item><item><title>Best Pure Sine Wave UPS Models for NUT usbhid-ups</title><link>https://upsshutdownguide.com/posts/best-pure-sine-wave-ups-nut-usbhid-ups/</link><guid isPermaLink="true">https://upsshutdownguide.com/posts/best-pure-sine-wave-ups-nut-usbhid-ups/</guid><description>Compare three pure sine wave UPS models with NUT usbhid-ups support, check their outlets and watt ratings, and verify shutdown features over USB.</description><pubDate>Thu, 26 Nov 2026 00:00:00 GMT</pubDate><content:encoded>&lt;p&gt;Start with the &lt;strong&gt;CyberPower CP1500PFCLCDa&lt;/strong&gt; for a 120 V tower. For 230 V, choose the &lt;strong&gt;CyberPower CP1500EPFCLCD&lt;/strong&gt; if you need Schuko outlets or the &lt;strong&gt;Eaton 5SC2200IRT&lt;/strong&gt; if you need a rack-mount unit. Compare their power ratings and reported support in Network UPS Tools (NUT) below.&lt;/p&gt;
&lt;h2&gt;Pure sine wave UPS shortlist&lt;/h2&gt;
&lt;table&gt;
&lt;thead&gt;
&lt;tr&gt;
&lt;th&gt;Best fit&lt;/th&gt;
&lt;th&gt;Model&lt;/th&gt;
&lt;th&gt;Power and outlets&lt;/th&gt;
&lt;th&gt;What NUT reports show&lt;/th&gt;
&lt;/tr&gt;
&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;
&lt;td&gt;120 V tower&lt;/td&gt;
&lt;td&gt;&lt;strong&gt;CyberPower CP1500PFCLCDa&lt;/strong&gt;&lt;/td&gt;
&lt;td&gt;1,500 VA / 1,000 W. Six NEMA 5-15R outlets with battery backup and six with surge protection only. &lt;a href=&quot;https://www.cyberpower.com/global/en/product/sku/cp1500pfclcda&quot;&gt;Specs&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;A NUT 2.8.5 report shows battery data and UPS status via &lt;code&gt;usbhid-ups&lt;/code&gt;. Voltage and load readings went missing after one NUT restart and returned after another. &lt;a href=&quot;https://github.com/networkupstools/nut/issues/2854&quot;&gt;USB report&lt;/a&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;230 V Schuko tower&lt;/td&gt;
&lt;td&gt;&lt;strong&gt;CyberPower CP1500EPFCLCD&lt;/strong&gt;&lt;/td&gt;
&lt;td&gt;1,500 VA / 900 W. Six battery-backed Schuko outlets on the European model shown. &lt;a href=&quot;https://www.cyberpower.com/eu/en/product/sku/CP1500EPFCLCD&quot;&gt;Specs&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;The NUT 2.7.3 report lists &lt;code&gt;shutdown.return&lt;/code&gt; and records a shutdown test with &lt;code&gt;usbhid-ups&lt;/code&gt;. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/ddl/Cyber_Power_Systems/CP1500EPFCLCD.html&quot;&gt;Device report&lt;/a&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;230 V rack or tower&lt;/td&gt;
&lt;td&gt;&lt;strong&gt;Eaton 5SC2200IRT&lt;/strong&gt;&lt;/td&gt;
&lt;td&gt;2,200 VA / 1,980 W. C20 input, eight C13 outlets and one C19 outlet. &lt;a href=&quot;https://upsselector.eaton.com/Solutions/index/1938944&quot;&gt;Specs&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;The NUT 2.7.4 report lists battery charge, runtime and the &lt;code&gt;shutdown.return&lt;/code&gt; command with &lt;code&gt;usbhid-ups&lt;/code&gt;. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/ddl/Eaton/5SC_2200i_RT.html&quot;&gt;Device report&lt;/a&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;h2&gt;Match the UPS to your load&lt;/h2&gt;
&lt;p&gt;Match the exact model number, voltage and outlet type before ordering. Add the wattage of the devices that need battery backup. Then check the manufacturer&apos;s runtime at that load and leave enough time for your system to shut down. &lt;a href=&quot;https://www.cyberpower.com/global/en/knowledge/buying-guide/ups&quot;&gt;CyberPower sizing guide&lt;/a&gt;, &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT shutdown guidance&lt;/a&gt;&lt;/p&gt;
&lt;p&gt;On the CP1500PFCLCDa, half of the 1,000 W rating is 500 W. CyberPower lists approximately 10 minutes at that load with a new, fully charged battery under normal conditions. Use the runtime at your own load when comparing models. &lt;a href=&quot;https://www.cyberpower.com/global/en/product/sku/cp1500pfclcda&quot;&gt;CP1500PFCLCDa runtime specifications&lt;/a&gt;&lt;/p&gt;
&lt;h2&gt;Verify USB monitoring and shutdown support&lt;/h2&gt;
&lt;p&gt;Connect the UPS to your NUT host over USB. For a single USB UPS, add this section to &lt;code&gt;ups.conf&lt;/code&gt;, then start the driver and the &lt;code&gt;upsd&lt;/code&gt; data server. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/man/usbhid-ups.html&quot;&gt;NUT driver manual&lt;/a&gt;, &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT configuration notes&lt;/a&gt;&lt;/p&gt;
&lt;pre&gt;&lt;code class=&quot;language-ini&quot;&gt;[myupsname]
    driver = usbhid-ups
    port = auto
&lt;/code&gt;&lt;/pre&gt;
&lt;p&gt;Run these read-only checks on the host. Substitute your section name for &lt;code&gt;myupsname&lt;/code&gt; if it differs.&lt;/p&gt;
&lt;pre&gt;&lt;code class=&quot;language-sh&quot;&gt;upsc myupsname@localhost ups.status
upsc myupsname@localhost
upscmd -l myupsname@localhost
&lt;/code&gt;&lt;/pre&gt;
&lt;ul&gt;
&lt;li&gt;The first command reads power status. Look for &lt;code&gt;OL&lt;/code&gt; on utility power. &lt;code&gt;OB&lt;/code&gt; means the UPS is on battery. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT status check&lt;/a&gt;&lt;/li&gt;
&lt;li&gt;The second lists available readings. Look for &lt;code&gt;driver.name: usbhid-ups&lt;/code&gt; and any battery data you need, such as &lt;code&gt;battery.charge&lt;/code&gt; or &lt;code&gt;battery.runtime&lt;/code&gt;. Available readings vary by model. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT configuration notes&lt;/a&gt;, &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/man/usbhid-ups.html&quot;&gt;NUT driver manual&lt;/a&gt;&lt;/li&gt;
&lt;li&gt;The third lists instant commands. Look for &lt;code&gt;shutdown.return&lt;/code&gt;, which the Eaton report lists for cutting power to the load and restoring it when power returns. Confirm the actual behavior with the shutdown test below. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/man/upscmd.html&quot;&gt;NUT command listing&lt;/a&gt;, &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/ddl/Eaton/5SC_2200i_RT.html&quot;&gt;NUT device command example&lt;/a&gt;&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;If you depend on automatic shutdown, configure &lt;code&gt;upsmon&lt;/code&gt;. The test can cut power to attached gear. Follow NUT&apos;s shutdown test with utility power absent. Check that the host shuts down before the UPS cuts output, that output returns with utility power, and that the host starts again. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT shutdown test procedure&lt;/a&gt;, &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/man/usbhid-ups.html&quot;&gt;USB driver shutdown guidance&lt;/a&gt;&lt;/p&gt;
&lt;p&gt;&lt;strong&gt;Evidence and limits.&lt;/strong&gt; Specs come from CyberPower and Eaton. The commands follow NUT 2.8.5 documentation, and compatibility details come from model-specific reports published by the NUT project. No hardware or commands were tested for this guide.&lt;/p&gt;
</content:encoded><category>ups</category><category>nut</category><category>usb-hid</category><category>pure sine wave</category><author>UPS Shutdown Guide Editorial</author></item><item><title>Eaton 5SC/5P vs CyberPower PFC vs APC Smart-UPS for NUT</title><link>https://upsshutdownguide.com/posts/eaton-5sc-5p-vs-cyberpower-pfc-vs-apc/</link><guid isPermaLink="true">https://upsshutdownguide.com/posts/eaton-5sc-5p-vs-cyberpower-pfc-vs-apc/</guid><description>Compare USB telemetry from Eaton 5SC and 5P, CyberPower PFC and APC Smart-UPS. See which NUT fields each report shows and how to check yours on Linux.</description><pubDate>Thu, 26 Nov 2026 00:00:00 GMT</pubDate><content:encoded>&lt;p&gt;For direct USB monitoring on Linux, NUT lists &lt;code&gt;usbhid-ups&lt;/code&gt; for USB connections to Eaton 5SC and 5P, CyberPower CP1500PFCLCD and select APC Smart-UPS models. If you need live watts, shortlist the Eaton 5SC 750 and 5P 650. Both have device reports with &lt;code&gt;ups.realpower&lt;/code&gt;. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/stable-hcl.html&quot;&gt;NUT compatibility list&lt;/a&gt;, &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/ddl/Eaton/5SC_750.html&quot;&gt;5SC 750 report&lt;/a&gt;, &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/ddl/Eaton/5P_650.html&quot;&gt;5P 650 reports&lt;/a&gt;.&lt;/p&gt;
&lt;h2&gt;What each UPS reports over USB&lt;/h2&gt;
&lt;p&gt;Each report below shows &lt;code&gt;ups.status&lt;/code&gt;, &lt;code&gt;battery.charge&lt;/code&gt;, &lt;code&gt;battery.runtime&lt;/code&gt; and &lt;code&gt;ups.load&lt;/code&gt;. The extra fields come from the named unit&apos;s report. The &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/man/usbhid-ups.html&quot;&gt;USB HID driver manual&lt;/a&gt; says the amount of data varies by manufacturer and model.&lt;/p&gt;
&lt;table&gt;
&lt;thead&gt;
&lt;tr&gt;
&lt;th&gt;UPS in the NUT device library&lt;/th&gt;
&lt;th&gt;Extra fields in the USB HID report&lt;/th&gt;
&lt;/tr&gt;
&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;
&lt;td&gt;&lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/ddl/Eaton/5SC_750.html&quot;&gt;Eaton 5SC 750&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;&lt;code&gt;ups.realpower&lt;/code&gt;, &lt;code&gt;ups.power&lt;/code&gt;, &lt;code&gt;input.frequency&lt;/code&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;&lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/ddl/Eaton/5P_650.html&quot;&gt;Eaton 5P 650&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;&lt;code&gt;ups.realpower&lt;/code&gt;, &lt;code&gt;ups.power&lt;/code&gt;, &lt;code&gt;outlet.1.status&lt;/code&gt;, &lt;code&gt;outlet.2.status&lt;/code&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;&lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/ddl/Cyber_Power_Systems/CP1500PFCLCD.html&quot;&gt;CyberPower CP1500PFCLCD&lt;/a&gt; (reports with USB vendor ID &lt;code&gt;0764&lt;/code&gt; and product ID &lt;code&gt;0501&lt;/code&gt;)&lt;/td&gt;
&lt;td&gt;&lt;code&gt;battery.runtime.low&lt;/code&gt;, &lt;code&gt;ups.realpower.nominal&lt;/code&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;&lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/ddl/APC/Smart-UPS_1500.html&quot;&gt;APC Smart-UPS 1500&lt;/a&gt; (NUT 2.7.2 USB HID report)&lt;/td&gt;
&lt;td&gt;&lt;code&gt;battery.temperature&lt;/code&gt;, &lt;code&gt;output.frequency&lt;/code&gt;, &lt;code&gt;input.transfer.reason&lt;/code&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;p&gt;If those four core fields are enough, all four examples are candidates. Before buying, check the exact model and connection in the &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/stable-hcl.html&quot;&gt;compatibility list&lt;/a&gt;. For example, the list names APC&apos;s SMT1500I under USB HID, while the table above describes a report labeled Smart-UPS 1500.&lt;/p&gt;
&lt;h2&gt;Read the telemetry on Linux&lt;/h2&gt;
&lt;p&gt;This manual example assumes NUT and its &lt;code&gt;usbhid-ups&lt;/code&gt; driver are installed, the driver can access one compatible UPS connected by USB, and the &lt;code&gt;upsd&lt;/code&gt; data server is configured to listen on &lt;code&gt;localhost&lt;/code&gt;. Add this section to &lt;code&gt;ups.conf&lt;/code&gt;. &lt;code&gt;usbhid-ups&lt;/code&gt; requires the &lt;code&gt;port&lt;/code&gt; setting and ignores its value when matching the device. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT configuration notes&lt;/a&gt;, &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/man/usbhid-ups.html&quot;&gt;USB HID driver manual&lt;/a&gt;.&lt;/p&gt;
&lt;pre&gt;&lt;code class=&quot;language-ini&quot;&gt;[myups]
    driver = usbhid-ups
    port = auto
&lt;/code&gt;&lt;/pre&gt;
&lt;p&gt;For a manual setup, start the driver with &lt;code&gt;upsdrvctl start&lt;/code&gt;, then start the configured data server with &lt;code&gt;upsd&lt;/code&gt;. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT configuration notes&lt;/a&gt;.&lt;/p&gt;
&lt;p&gt;Run these read-only commands on the NUT server. The first lists UPS names, the second reads the power status, and the last lists all available fields. Use the name shown by the first command if your section has a different name. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/man/upsc.html&quot;&gt;NUT upsc manual&lt;/a&gt;.&lt;/p&gt;
&lt;pre&gt;&lt;code class=&quot;language-sh&quot;&gt;upsc -l
upsc myups@localhost ups.status
upsc myups@localhost
&lt;/code&gt;&lt;/pre&gt;
&lt;ul&gt;
&lt;li&gt;&lt;strong&gt;Power state.&lt;/strong&gt; Look for &lt;code&gt;OL&lt;/code&gt; on line power. &lt;code&gt;OB&lt;/code&gt; means on battery and &lt;code&gt;LB&lt;/code&gt; means low battery. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT configuration notes&lt;/a&gt;.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;Battery.&lt;/strong&gt; Read &lt;code&gt;battery.charge&lt;/code&gt; as a percentage and &lt;code&gt;battery.runtime&lt;/code&gt; in seconds. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/developer-guide.chunked/_variables.html&quot;&gt;NUT variable definitions&lt;/a&gt;.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;Load.&lt;/strong&gt; Use &lt;code&gt;ups.load&lt;/code&gt; for percent, &lt;code&gt;ups.realpower&lt;/code&gt; for current watts and &lt;code&gt;ups.power&lt;/code&gt; for current volt-amperes. Treat &lt;code&gt;ups.realpower.nominal&lt;/code&gt; as nominal watts. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/developer-guide.chunked/_variables.html&quot;&gt;NUT variable definitions&lt;/a&gt;.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;When &lt;code&gt;upsc&lt;/code&gt; returns values for your UPS, NUT can read its data. Configure &lt;code&gt;upsmon&lt;/code&gt; separately for automatic shutdown. For a UPS with an SNMP management card, see the &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/man/snmp-ups.html&quot;&gt;&lt;code&gt;snmp-ups&lt;/code&gt; manual&lt;/a&gt;. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT configuration notes&lt;/a&gt;.&lt;/p&gt;
&lt;p&gt;&lt;strong&gt;Evidence and limits.&lt;/strong&gt; NUT 2.8.5 documentation and historical NUT device reports were checked on November 26, 2026. The commands were not run on hardware for this guide.&lt;/p&gt;
</content:encoded><category>nut</category><category>linux</category><category>usb</category><category>telemetry</category><author>UPS Shutdown Guide Editorial</author></item><item><title>NUT Setup for Synology, TrueNAS, and Proxmox</title><link>https://upsshutdownguide.com/posts/multi-host-nut-master-client-synology-truenas-proxmox/</link><guid isPermaLink="true">https://upsshutdownguide.com/posts/multi-host-nut-master-client-synology-truenas-proxmox/</guid><description>Connect one UPS to Synology, configure TrueNAS and Proxmox as NUT clients, and verify that both hosts are ready for a controlled shutdown.</description><pubDate>Thu, 26 Nov 2026 00:00:00 GMT</pubDate><content:encoded>&lt;p&gt;Connect the UPS directly to Synology and enable its network UPS server. Set TrueNAS and the Proxmox host up as Network UPS Tools (NUT) clients that monitor the same UPS over the LAN. Put all three hosts on battery-backed power. During the battery test, verify that any switch on either client&apos;s network path to Synology stays powered and that both clients can still read UPS status. The clients need that connection to receive the shutdown signal. &lt;a href=&quot;https://isohd.net/powerwalker/kb/f40/How_to_access_UPS_on_Synology&quot;&gt;BlueWalker setup&lt;/a&gt; · &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT configuration manual&lt;/a&gt;&lt;/p&gt;
&lt;h2&gt;Set up Synology as the UPS server&lt;/h2&gt;
&lt;p&gt;Use a UPS that DSM recognizes. This setup uses a separate TrueNAS machine and a standalone Proxmox VE host. &lt;a href=&quot;https://isohd.net/powerwalker/kb/f40/How_to_access_UPS_on_Synology&quot;&gt;BlueWalker setup&lt;/a&gt; · &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT configuration manual&lt;/a&gt;&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Connect the UPS to the Synology NAS. In DSM, open &lt;strong&gt;Control Panel &amp;gt; Hardware &amp;amp; Power &amp;gt; UPS&lt;/strong&gt; and select &lt;strong&gt;Enable UPS support&lt;/strong&gt; and &lt;strong&gt;Enable network UPS server&lt;/strong&gt;. &lt;a href=&quot;https://www.home-assistant.io/integrations/synology_dsm/#ups-support&quot;&gt;DSM integration guide&lt;/a&gt;&lt;/li&gt;
&lt;li&gt;Open &lt;strong&gt;Permitted Synology NAS Devices&lt;/strong&gt; and add the LAN IP addresses of TrueNAS and Proxmox. Click &lt;strong&gt;OK&lt;/strong&gt;, then &lt;strong&gt;Apply&lt;/strong&gt;. &lt;a href=&quot;https://www.home-assistant.io/integrations/synology_dsm/#ups-support&quot;&gt;DSM integration guide&lt;/a&gt; · &lt;a href=&quot;https://github.com/gbakeman/WinNUT-Client/wiki/Synology-Devices&quot;&gt;WinNUT Synology setup&lt;/a&gt;&lt;/li&gt;
&lt;li&gt;If a firewall sits between the hosts, allow the two client IP addresses to reach the Synology NAS on TCP port &lt;code&gt;3493&lt;/code&gt;. &lt;a href=&quot;https://www.home-assistant.io/integrations/synology_dsm/#ups-support&quot;&gt;DSM integration guide&lt;/a&gt; · &lt;a href=&quot;https://networkupstools.org/docs/developer-guide.chunked/ar01s09.html&quot;&gt;NUT protocol guide&lt;/a&gt;&lt;/li&gt;
&lt;/ol&gt;
&lt;h2&gt;Connect Proxmox as a client&lt;/h2&gt;
&lt;p&gt;Proxmox VE 9.0 uses Debian 13. In the Proxmox host shell, run these commands to install the Debian NUT client. &lt;a href=&quot;https://www.proxmox.com/en/about/company-details/press-releases/proxmox-virtual-environment-9-0&quot;&gt;Proxmox VE 9.0 release&lt;/a&gt; · &lt;a href=&quot;https://manpages.debian.org/trixie/apt/apt.8.en.html&quot;&gt;APT manual&lt;/a&gt; · &lt;a href=&quot;https://manpages.debian.org/trixie/nut-client/upsc.8.en.html&quot;&gt;Debian NUT client manual&lt;/a&gt;&lt;/p&gt;
&lt;pre&gt;&lt;code class=&quot;language-sh&quot;&gt;apt update
apt install nut-client
&lt;/code&gt;&lt;/pre&gt;
&lt;h3&gt;Find the UPS name and monitor credentials&lt;/h3&gt;
&lt;p&gt;Replace &lt;code&gt;synology-ip&lt;/code&gt; with the NAS LAN IP address in the examples. List the UPS names, then query the status of the name returned. The example uses &lt;code&gt;ups&lt;/code&gt;. A status containing &lt;code&gt;OL&lt;/code&gt; means the unit reports line power. &lt;a href=&quot;https://manpages.debian.org/trixie/nut-client/upsc.8.en.html&quot;&gt;upsc manual&lt;/a&gt; · &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT configuration manual&lt;/a&gt;&lt;/p&gt;
&lt;pre&gt;&lt;code class=&quot;language-sh&quot;&gt;upsc -l synology-ip
upsc ups@synology-ip ups.status
&lt;/code&gt;&lt;/pre&gt;
&lt;p&gt;Use the UPS monitor username and password accepted by the DSM server. If using the built-in login, consult the credentials listed in the WinNUT project&apos;s Synology instructions. Verify the monitor logins after configuring both clients. &lt;a href=&quot;https://github.com/gbakeman/WinNUT-Client/wiki/Synology-Devices&quot;&gt;WinNUT Synology setup&lt;/a&gt; · &lt;a href=&quot;https://manpages.debian.org/trixie/nut-client/upsmon.conf.5.en.html&quot;&gt;NUT monitor configuration&lt;/a&gt; · &lt;a href=&quot;https://networkupstools.org/docs/developer-guide.chunked/ar01s09.html&quot;&gt;NUT protocol guide&lt;/a&gt;&lt;/p&gt;
&lt;h3&gt;Configure the shutdown monitor&lt;/h3&gt;
&lt;p&gt;Set the mode in &lt;code&gt;/etc/nut/nut.conf&lt;/code&gt; to run the network client. &lt;a href=&quot;https://manpages.debian.org/trixie/nut-client/nut.conf.5.en.html&quot;&gt;nut.conf manual&lt;/a&gt;&lt;/p&gt;
&lt;pre&gt;&lt;code class=&quot;language-ini&quot;&gt;MODE=netclient
&lt;/code&gt;&lt;/pre&gt;
&lt;p&gt;For a host with one power supply backed by the UPS, use the following monitor settings in &lt;code&gt;/etc/nut/upsmon.conf&lt;/code&gt;. The example uses NUT’s sample shutdown command. Replace the UPS name, address and credential placeholders with your values. The two &lt;code&gt;1&lt;/code&gt; values mean the UPS feeds one power supply and the host needs one powered supply. &lt;a href=&quot;https://manpages.debian.org/trixie/nut-client/upsmon.conf.5.en.html&quot;&gt;NUT monitor configuration&lt;/a&gt; · &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT configuration manual&lt;/a&gt;&lt;/p&gt;
&lt;pre&gt;&lt;code class=&quot;language-text&quot;&gt;MONITOR ups@synology-ip:3493 1 MONITOR_USER MONITOR_PASSWORD secondary
MINSUPPLIES 1
SHUTDOWNCMD &amp;quot;/sbin/shutdown -h +0&amp;quot;
&lt;/code&gt;&lt;/pre&gt;
&lt;p&gt;Enable the monitor at boot and restart it to load the configuration. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT configuration manual&lt;/a&gt; · &lt;a href=&quot;https://manpages.debian.org/trixie/systemd/systemctl.1.en.html&quot;&gt;systemctl manual&lt;/a&gt;&lt;/p&gt;
&lt;pre&gt;&lt;code class=&quot;language-sh&quot;&gt;systemctl enable nut-monitor.service
systemctl restart nut-monitor.service
&lt;/code&gt;&lt;/pre&gt;
&lt;h2&gt;Connect TrueNAS as a client&lt;/h2&gt;
&lt;p&gt;In TrueNAS 25.10, go to &lt;strong&gt;System &amp;gt; Services&lt;/strong&gt; and edit &lt;strong&gt;UPS&lt;/strong&gt;. The 25.10.0 client builds its NUT target from the identifier, remote host and port. It uses the monitor credentials to log in. &lt;a href=&quot;https://www.truenas.com/docs/scale/25.10/scaleuireference/systemsettings/services/upsservicesscreenscale/&quot;&gt;UPS settings&lt;/a&gt; · &lt;a href=&quot;https://github.com/truenas/middleware/blob/TS-25.10.0/src/middlewared/middlewared/plugins/ups.py&quot;&gt;TrueNAS service code&lt;/a&gt; · &lt;a href=&quot;https://github.com/truenas/middleware/blob/TS-25.10.0/src/middlewared/middlewared/etc_files/local/nut/upsmon.conf.mako&quot;&gt;TrueNAS monitor template&lt;/a&gt;&lt;/p&gt;
&lt;table&gt;
&lt;thead&gt;
&lt;tr&gt;
&lt;th&gt;Setting&lt;/th&gt;
&lt;th&gt;Value&lt;/th&gt;
&lt;/tr&gt;
&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;
&lt;td&gt;UPS Mode&lt;/td&gt;
&lt;td&gt;&lt;strong&gt;Slave&lt;/strong&gt;, the client mode&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;Identifier&lt;/td&gt;
&lt;td&gt;UPS name returned by &lt;code&gt;upsc -l&lt;/code&gt;, for example &lt;code&gt;ups&lt;/code&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;Remote Host&lt;/td&gt;
&lt;td&gt;Synology LAN IP address&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;Remote Port&lt;/td&gt;
&lt;td&gt;&lt;code&gt;3493&lt;/code&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;Monitor User and Monitor Password&lt;/td&gt;
&lt;td&gt;The same DSM UPS monitor credentials&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;Shutdown Mode&lt;/td&gt;
&lt;td&gt;&lt;strong&gt;UPS reaches low battery&lt;/strong&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;Remote Monitor&lt;/td&gt;
&lt;td&gt;Off&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;Power off UPS&lt;/td&gt;
&lt;td&gt;Off&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;p&gt;Start &lt;strong&gt;UPS&lt;/strong&gt; on the Services screen and turn on &lt;strong&gt;Start Automatically&lt;/strong&gt;. &lt;a href=&quot;https://www.truenas.com/docs/scale/25.10/scaleuireference/systemsettings/services/&quot;&gt;TrueNAS Services&lt;/a&gt; · &lt;a href=&quot;https://www.truenas.com/docs/scale/25.10/scaleuireference/systemsettings/services/upsservicesscreenscale/&quot;&gt;UPS settings&lt;/a&gt;&lt;/p&gt;
&lt;h2&gt;Verify logins and plan a shutdown test&lt;/h2&gt;
&lt;p&gt;From Proxmox, check the connected clients for the UPS. For a server that supports client listing, look for both client IP addresses in the output. &lt;a href=&quot;https://manpages.debian.org/trixie/nut-client/upsc.8.en.html&quot;&gt;upsc manual&lt;/a&gt; · &lt;a href=&quot;https://networkupstools.org/docs/developer-guide.chunked/ar01s09.html&quot;&gt;NUT protocol guide&lt;/a&gt;&lt;/p&gt;
&lt;pre&gt;&lt;code class=&quot;language-sh&quot;&gt;upsc -c ups@synology-ip
&lt;/code&gt;&lt;/pre&gt;
&lt;p&gt;If the server does not support client listing, check the syslog on TrueNAS and Proxmox for &lt;code&gt;upsmon&lt;/code&gt; startup messages and errors. If the Synology server logs are available, look for a separate &lt;code&gt;upsd&lt;/code&gt; entry for each client IP that includes &lt;code&gt;logged into UPS&lt;/code&gt; and the UPS name. A status response or a startup message alone leaves the monitor logins unverified. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT configuration manual&lt;/a&gt; · &lt;a href=&quot;https://manpages.debian.org/trixie/nut-client/upsc.8.en.html&quot;&gt;upsc manual&lt;/a&gt;&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;If the status query fails, check the DSM allowlist, server address, UPS name and firewall. If status works but a monitor fails to log in, check that client&apos;s credentials and settings. &lt;a href=&quot;https://manpages.debian.org/trixie/nut-client/upsc.8.en.html&quot;&gt;upsc manual&lt;/a&gt; · &lt;a href=&quot;https://github.com/gbakeman/WinNUT-Client/wiki/Synology-Devices&quot;&gt;WinNUT Synology setup&lt;/a&gt; · &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT configuration manual&lt;/a&gt;&lt;/li&gt;
&lt;li&gt;A battery in very poor condition can shut off the UPS immediately. For a controlled outage, switch off the UPS input at the input breaker. A status containing &lt;code&gt;OB&lt;/code&gt; means the UPS is on battery. &lt;a href=&quot;https://powerwalker.com/infocenter/ups-basics/&quot;&gt;BlueWalker test procedure&lt;/a&gt; · &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT configuration manual&lt;/a&gt;&lt;/li&gt;
&lt;li&gt;Verify that both client hosts shut down before the UPS battery runs out. After restoring input power, verify that each host and UPS monitor returns to service. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.5/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT configuration manual&lt;/a&gt; · &lt;a href=&quot;https://powerwalker.com/infocenter/ups-basics/&quot;&gt;BlueWalker test procedure&lt;/a&gt;&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;&lt;strong&gt;Evidence and limits.&lt;/strong&gt; The setup follows the DSM integration instructions, TrueNAS 25.10 documentation and source, Proxmox VE 9.0 and Debian 13 manuals for NUT 2.8.1, and the NUT 2.8.5 configuration guide. The steps were not run for this article.&lt;/p&gt;
</content:encoded><category>nut</category><category>ups</category><category>synology</category><category>truenas</category><category>proxmox</category><author>UPS Shutdown Guide Editorial</author></item><item><title>Raspberry Pi NUT Server vs NAS NUT Master vs UPS SNMP Card</title><link>https://upsshutdownguide.com/posts/raspberry-pi-nut-server-vs-nas-nut-master/</link><guid isPermaLink="true">https://upsshutdownguide.com/posts/raspberry-pi-nut-server-vs-nas-nut-master/</guid><description>Compare a Raspberry Pi NUT server, a NAS NUT master, and a UPS SNMP card. See which device handles shutdown and how to verify UPS status.</description><pubDate>Thu, 26 Nov 2026 00:00:00 GMT</pubDate><content:encoded>&lt;p&gt;Use a Raspberry Pi running Network UPS Tools (NUT) when you want a separate host to read the UPS and serve status to clients. Use the NAS as UPS master if it already has the USB connection and can serve your clients. Choose an SNMP card when the UPS supports it and the devices can use direct SNMP or get UPS status through a NUT server. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/user-manual.chunked/Overview.html&quot;&gt;NUT 2.8.4 overview&lt;/a&gt; · &lt;a href=&quot;https://docs.qnap.com/operating-system/qts/5.2.x/en-us/configuring-the-ups-settings-2AD2FE5E.html&quot;&gt;QNAP QTS 5.2.x UPS settings&lt;/a&gt; · &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/man/snmp-ups.html&quot;&gt;NUT 2.8.4 snmp-ups manual&lt;/a&gt;&lt;/p&gt;
&lt;h2&gt;Compare the three setups&lt;/h2&gt;
&lt;table&gt;
&lt;thead&gt;
&lt;tr&gt;
&lt;th&gt;Setup&lt;/th&gt;
&lt;th&gt;Where UPS status comes from&lt;/th&gt;
&lt;th&gt;What handles shutdown&lt;/th&gt;
&lt;/tr&gt;
&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;
&lt;td&gt;Dedicated Raspberry Pi&lt;/td&gt;
&lt;td&gt;A NUT driver reads the UPS over USB. The Pi&apos;s &lt;code&gt;upsd&lt;/code&gt; service relays status to clients.&lt;/td&gt;
&lt;td&gt;&lt;code&gt;upsmon&lt;/code&gt; on the Pi acts as primary. Secondary &lt;code&gt;upsmon&lt;/code&gt; clients handle their own host shutdown. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/user-manual.chunked/Overview.html&quot;&gt;NUT roles&lt;/a&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;NAS as UPS master&lt;/td&gt;
&lt;td&gt;The USB cable goes to the NAS. In QTS 5.2.x the NAS sends power-failure notifications to the client IPs you configured.&lt;/td&gt;
&lt;td&gt;In QTS, set the outage response on each NAS, such as timed shutdown or auto-protection. &lt;a href=&quot;https://docs.qnap.com/operating-system/qts/5.2.x/en-us/configuring-the-ups-settings-2AD2FE5E.html&quot;&gt;QTS UPS modes&lt;/a&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;UPS with an SNMP card&lt;/td&gt;
&lt;td&gt;A compatible card exposes UPS status on the network. A device can read it directly if it supports SNMP UPS mode, or a NUT server can read it on the clients&apos; behalf.&lt;/td&gt;
&lt;td&gt;In QTS, the NAS follows its configured outage response. A NUT setup uses &lt;code&gt;upsmon&lt;/code&gt;. &lt;a href=&quot;https://docs.qnap.com/operating-system/qts/5.2.x/en-us/configuring-the-ups-settings-2AD2FE5E.html&quot;&gt;QTS UPS modes&lt;/a&gt; · &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/man/snmp-ups.html&quot;&gt;NUT SNMP driver&lt;/a&gt; · &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/user-manual.chunked/Overview.html&quot;&gt;NUT roles&lt;/a&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;p&gt;One NAS with NUT built into its firmware accepted only a small number of client IP addresses. If you have a mix of systems, check the NAS server against each intended client before choosing it as the UPS master. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/FAQ.html&quot;&gt;NUT guidance for appliances&lt;/a&gt;&lt;/p&gt;
&lt;h2&gt;Set up a dedicated Raspberry Pi&lt;/h2&gt;
&lt;p&gt;Use the &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/user-manual.chunked/_installation_instructions.html&quot;&gt;NUT installation instructions&lt;/a&gt; to prepare NUT, then look up the UPS model and its USB connection in the &lt;a href=&quot;https://networkupstools.org/stable-hcl.html&quot;&gt;NUT compatibility list&lt;/a&gt;.&lt;/p&gt;
&lt;p&gt;With the UPS USB data cable connected to the Pi, add an entry in &lt;code&gt;ups.conf&lt;/code&gt;. This example uses the &lt;code&gt;usbhid-ups&lt;/code&gt; driver for a model listed with that driver. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT driver configuration&lt;/a&gt; · &lt;a href=&quot;https://networkupstools.org/stable-hcl.html&quot;&gt;NUT compatibility list&lt;/a&gt;&lt;/p&gt;
&lt;pre&gt;&lt;code class=&quot;language-ini&quot;&gt;[rackups]
    driver = usbhid-ups
    port = auto
&lt;/code&gt;&lt;/pre&gt;
&lt;p&gt;Set &lt;code&gt;MODE=netserver&lt;/code&gt; in &lt;code&gt;nut.conf&lt;/code&gt;. In &lt;code&gt;upsd.conf&lt;/code&gt;, add &lt;code&gt;LISTEN 127.0.0.1&lt;/code&gt; for local monitoring and &lt;code&gt;LISTEN 192.168.50.10&lt;/code&gt; for network clients, replacing the example LAN address with the Pi&apos;s. Restrict access to your intended clients with firewall rules. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/man/nut.conf.html&quot;&gt;NUT mode settings&lt;/a&gt; · &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/user-manual.chunked/NUT_Security.html&quot;&gt;NUT listener and firewall guidance&lt;/a&gt;&lt;/p&gt;
&lt;p&gt;If your NUT installation manages drivers as individual service instances and provides &lt;code&gt;upsdrvsvcctl&lt;/code&gt;, run &lt;code&gt;upsdrvsvcctl resync&lt;/code&gt; and &lt;code&gt;upsdrvsvcctl start rackups&lt;/code&gt;. Then use the service manager to start &lt;code&gt;nut-server&lt;/code&gt;, or restart it if it is already running. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/user-manual.chunked/Overview.html&quot;&gt;NUT driver startup&lt;/a&gt; · &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT service configuration&lt;/a&gt;&lt;/p&gt;
&lt;p&gt;For a manual startup, run &lt;code&gt;upsdrvctl start rackups&lt;/code&gt; and then &lt;code&gt;upsd&lt;/code&gt;. If a manually started &lt;code&gt;upsd&lt;/code&gt; is already running and saved a PID file, stop it with &lt;code&gt;upsd -c stop&lt;/code&gt; before starting it again. If &lt;code&gt;upsd&lt;/code&gt; was already running, the &lt;code&gt;LISTEN&lt;/code&gt; changes take effect after a restart. Complete the restart before running &lt;code&gt;upsc&lt;/code&gt;. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT server configuration&lt;/a&gt; · &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/user-manual.chunked/NUT_Security.html&quot;&gt;NUT listener guidance&lt;/a&gt;&lt;/p&gt;
&lt;p&gt;Use the &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT automatic shutdown configuration&lt;/a&gt; to set up &lt;code&gt;upsmon&lt;/code&gt; on the Pi and any hosts it should protect. The USB-connected Pi takes the primary role and the remote NUT monitors take the secondary role. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/user-manual.chunked/Overview.html&quot;&gt;NUT roles&lt;/a&gt;&lt;/p&gt;
&lt;h2&gt;Use the NAS as the UPS master&lt;/h2&gt;
&lt;p&gt;On QNAP QTS 5.2.x, connect the UPS to the NAS by USB. Open &lt;strong&gt;Control Panel → System → External Device → UPS&lt;/strong&gt;, choose &lt;strong&gt;USB connection&lt;/strong&gt;, and select the NAS&apos;s outage response and delay. Select &lt;strong&gt;Enable network UPS master&lt;/strong&gt;, enter the client IP addresses, and select &lt;strong&gt;Apply&lt;/strong&gt;. &lt;a href=&quot;https://docs.qnap.com/operating-system/qts/5.2.x/en-us/configuring-the-ups-settings-2AD2FE5E.html&quot;&gt;QNAP QTS 5.2.x UPS settings&lt;/a&gt;&lt;/p&gt;
&lt;p&gt;On a second QNAP NAS on the same network, use &lt;strong&gt;Network UPS slave&lt;/strong&gt; in the UPS settings and enter the USB-connected NAS&apos;s IP address. Choose the second NAS&apos;s outage response and delay, then select &lt;strong&gt;Apply&lt;/strong&gt;. In QTS 5.2.x the master option requires the USB connection. &lt;a href=&quot;https://docs.qnap.com/operating-system/qts/5.2.x/en-us/configuring-the-ups-settings-2AD2FE5E.html&quot;&gt;QNAP QTS 5.2.x UPS settings&lt;/a&gt;&lt;/p&gt;
&lt;h2&gt;Use the UPS SNMP card&lt;/h2&gt;
&lt;ul&gt;
&lt;li&gt;&lt;strong&gt;Direct SNMP.&lt;/strong&gt; In QTS 5.2.x, put the UPS on the NAS network and choose &lt;strong&gt;SNMP connection&lt;/strong&gt; in the UPS settings. Enter the UPS&apos;s IP address and configure the SNMP community. Choose the NAS&apos;s outage response and apply the settings. &lt;a href=&quot;https://docs.qnap.com/operating-system/qts/5.2.x/en-us/configuring-the-ups-settings-2AD2FE5E.html&quot;&gt;QTS SNMP setup&lt;/a&gt;&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;SNMP through NUT.&lt;/strong&gt; On the NUT server, use &lt;code&gt;driver = snmp-ups&lt;/code&gt; in &lt;code&gt;ups.conf&lt;/code&gt;. For a card using the default SNMP port, set &lt;code&gt;port&lt;/code&gt; to the card&apos;s IP address. Set &lt;code&gt;snmp_version&lt;/code&gt; to &lt;code&gt;v1&lt;/code&gt; or &lt;code&gt;v2c&lt;/code&gt; and set &lt;code&gt;community&lt;/code&gt; to match the card&apos;s configuration. If NUT will send a power-down command with this setup, use a read/write community. NUT clients connect to the NUT server&apos;s IP. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/man/snmp-ups.html&quot;&gt;NUT SNMP driver settings&lt;/a&gt; · &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/user-manual.chunked/Overview.html&quot;&gt;NUT network architecture&lt;/a&gt;&lt;/li&gt;
&lt;/ul&gt;
&lt;h2&gt;Verify status from a client&lt;/h2&gt;
&lt;p&gt;To check that a NUT endpoint serves UPS status, use &lt;code&gt;upsc&lt;/code&gt; from a client to list the UPS names served by &lt;code&gt;upsd&lt;/code&gt;. Then query &lt;code&gt;ups.status&lt;/code&gt; using one of the returned names. Here the server is at &lt;code&gt;192.168.50.10&lt;/code&gt; and the UPS is named &lt;code&gt;rackups&lt;/code&gt;. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/man/upsc.html&quot;&gt;NUT 2.8.4 upsc manual&lt;/a&gt;&lt;/p&gt;
&lt;pre&gt;&lt;code class=&quot;language-sh&quot;&gt;upsc -l 192.168.50.10
upsc rackups@192.168.50.10 ups.status
&lt;/code&gt;&lt;/pre&gt;
&lt;p&gt;Look for &lt;code&gt;OL&lt;/code&gt; while the UPS is on line power. Use the same check with an SNMP-backed NUT server or with a NAS that serves NUT and permits the querying client. If the client returns an error, check the UPS name, the &lt;code&gt;upsd&lt;/code&gt; service and the firewall. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT status check&lt;/a&gt; · &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/man/upsc.html&quot;&gt;Read-only client documentation&lt;/a&gt; · &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/FAQ.html&quot;&gt;NUT appliance access&lt;/a&gt;&lt;/p&gt;
&lt;h2&gt;Check the shutdown path&lt;/h2&gt;
&lt;ul&gt;
&lt;li&gt;&lt;strong&gt;Check the network path.&lt;/strong&gt; During a planned outage drill, check that the clients can still reach their status source on battery power. For NUT clients that source is the running &lt;code&gt;upsd&lt;/code&gt; service. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/user-manual.chunked/Overview.html&quot;&gt;NUT status dependencies&lt;/a&gt; · &lt;a href=&quot;https://docs.qnap.com/operating-system/qts/5.2.x/en-us/configuring-the-ups-settings-2AD2FE5E.html&quot;&gt;QTS network requirements&lt;/a&gt;&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;Confirm each host&apos;s action.&lt;/strong&gt; Check that each protected system starts its configured shutdown or protection mode. For QTS 5.2.x in &lt;strong&gt;Network UPS slave&lt;/strong&gt; or &lt;strong&gt;SNMP connection&lt;/strong&gt; mode, watch the receiving NAS during the planned outage. When the outage lasts for the delay configured on that NAS, verify that it powers off or enters auto-protection mode, whichever you selected. In NUT&apos;s documented low-battery sequence for one UPS, the primary signals the secondaries and waits for them to disconnect or for its wait limit to expire. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT shutdown design&lt;/a&gt; · &lt;a href=&quot;https://docs.qnap.com/operating-system/qts/5.2.x/en-us/configuring-the-ups-settings-2AD2FE5E.html&quot;&gt;QTS outage responses&lt;/a&gt;&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;Verify UPS output power separately.&lt;/strong&gt; If you configure NUT to turn off the UPS load at the end of shutdown, verify that the driver and UPS support it. With NUT&apos;s SNMP driver, the host&apos;s network stack may already be down when the driver tries to send the command. &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/user-manual.chunked/Configuration_notes.html&quot;&gt;NUT power-off support&lt;/a&gt; · &lt;a href=&quot;https://networkupstools.org/historic/v2.8.4/docs/man/snmp-ups.html&quot;&gt;SNMP shutdown limitations&lt;/a&gt;&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;&lt;strong&gt;Evidence and limits.&lt;/strong&gt; This comparison is based on NUT 2.8.4 and QNAP QTS 5.2.x documentation. The steps were not run on hardware.&lt;/p&gt;
</content:encoded><category>ups</category><category>nut</category><category>raspberry-pi</category><category>nas</category><category>snmp</category><author>UPS Shutdown Guide Editorial</author></item></channel></rss>